Karnataka Fire NOC Rules 2023 to 2026: What Changed
Fire pump control panel being checked during an inspection
Report · 6 min read

Karnataka Fire Rules 2023 to 2026: What Changed for Buildings

In four years Karnataka moved its fire rules more than in the decades before. A building approved in 2022 and renewed in 2026 lives under a noticeably different set of expectations.

By the Simfy Firesys team·Passive fire protection, Hyderabad
Fire pump control panel being checked during an inspection
ReportThe rules changed. The inspection still ends at the pump room and the riser.
The short answer

Between 2023 and 2026, Karnataka made the fire NOC compulsory for high rise buildings of 21 metres or more through a 2023 amendment, added a fire cess on new multi-storied buildings through a 2025 amendment, tightened fire checks on private hospitals through a 2024 health department circular, and in January 2026 set proportionate fire measures for hospitals below high rise height.

What changed in Karnataka's fire rules?

This report pulls together the main changes to fire rules for buildings in Karnataka from 2023 to 2026, as reported in the sources listed below. It is a summary for owners and project teams, not a legal opinion. Read the official text before you act on any single line.

Timeline

Karnataka fire rule changes, 2023 to 2026

As reported by Deccan Herald, CalcGuru and Security Today.

  1. 2023Ordinance, then Amendment Act: NOC compulsory for high rise buildings of 21 m or more.
  2. June 2024Health circular: hospital NOC checks, self-declaration below 21 m, quarterly audits.
  3. 2025Amendment Act 59 of 2025: fire cess on new multi-storied buildings.
  4. 9 January 2026Order on proportionate fire measures for hospitals below high rise.
  5. 4 November 2026Draft notification: high rise threshold 21 m to 24 m in zonal regulations. Not in force.
Read the latest textSummaries help. The gazette and KSFES notices decide.
Each change added a check. None removed the need for the building to actually be safe.

2023: the 21 metre NOC becomes compulsory

According to Deccan Herald, the Karnataka assembly passed a bill in 2023, replacing an ordinance issued in March that year, under which a NOC from the Fire and Emergency Services Department is compulsory before anyone builds to 21 metres or more. The minister said at the time that the change followed the National Building Code 2016. CalcGuru's summary of the amended section 13(3) confirms the 21 metre definition, irrespective of occupancy.

The practical effect is a single, clear height line for every use. Our fire NOC guide for Bangalore explains how the approval works.

2024: hospitals under the spotlight

As Deccan Herald reported on 5 June 2024, after a fatal fire at a Delhi hospital the Karnataka health department told private medical establishments to follow fire safety rules. Buildings above 21 metres had to hold a valid fire NOC. Those below had to submit a self-declaration of their fire measures. District committees were to audit hospital fire safety every quarter and report compliance.

2025: the fire cess

On 24 July 2025, according to Deccan Herald, a bill proposed a 1% cess on new tall buildings by amending section 15 of the Act. According to CalcGuru, the resulting Karnataka Fire Force (Amendment) Act, 2025 (Act 59 of 2025) levies a surcharge of 1% on the property tax of newly constructed multi-storied buildings, with a ceiling in the Act, collected by the municipality with property tax. It recurs each tax cycle and is not the NOC fee.

January 2026: proportionate measures for hospitals

According to Security Today, a Home Department order of 9 January 2026 set proportionate fire safety measures for hospital buildings within 20.99 metres in height. The fire department issues fire advisory certificates based on building height and built-up area, the health department verifies compliance for institutions under it, and the fire department keeps the power to inspect at any time. Our note on the 2026 hospital order goes into detail.

November 2026: a draft proposal to raise the threshold to 24 m

According to Realty Today, on 4 November 2026 the Urban Development Department published a draft notification under the Karnataka Town and Country Planning Act that would raise the height at which a building counts as high rise in the zonal regulations, from 21 metres to 24 metres. The report says it follows a recommendation from KSFES and is open for objections for 30 days.

It is not in force. Until a final notification is published, the 21 metre definition applies, and the Fire Force Act text from 2023 has not changed. If you are designing a building between 21 and 24 metres now, plan for the current rule and ask your consultant to track the final notification.

What it means for owners

ChangeWho is affectedWhat to do
21 m NOC compulsoryEvery project of 21 m or morePlan the NOC into the approval programme
Fire cessNew multi-storied buildingsBudget it as a recurring cost with property tax
2024 hospital circularPrivate medical establishmentsKeep NOC or self-declaration current; prepare for audits
2026 hospital orderHospitals below 20.99 mCheck which advisory measures apply to your height and area

Source: summarised from the reports cited below.

Rules set the floor. A building that only meets the floor on inspection day often falls below it a year later.

What did not change

The technical standard, the National Building Code 2016 Part 4, still sets the substance: exits, compartments, fire doors, protected shafts and structural fire resistance. The new rules mostly change who checks and when. The hidden passive work, such as sealing every penetration through a fire wall, is still what decides whether a building holds a fire in one place. Our guide to fire compartmentation under NBC explains why.

Questions to ask your consultant this year

  • Which approvals does our building hold today, and when does each one lapse?
  • Has anything been altered since the last approval: tenant works, new shafts, extra floors?
  • Do we pay the 2025 cess, and is it already in our tax demand?
  • If we run a clinic or hospital, which 2024 and 2026 requirements apply to us?
  • Where are the records for hidden work: seals, coatings, door certificates?
  • Who inside our organisation owns fire compliance between renewals?

A clear answer to each of these is worth more than any summary of the law. If an answer is "we are not sure", that is the place to start.

Where we fit

We do not file NOCs or interpret law for clients. We are passive fire protection specialists from Hyderabad. We audit, seal and document the passive side, so that whatever the rule of the year, the building behind the paperwork is sound. For the full picture of compliance in the city, see our Bengaluru fire safety handbook.

Questions people ask
?
What are the Karnataka fire NOC rules now?According to published summaries of the Karnataka Fire Force Act, 1964 as amended, a fire NOC is compulsory for high rise buildings of 21 metres or more, irrespective of occupancy. New multi-storied buildings also pay a fire cess with property tax under the 2025 amendment.
?
What is the fire cess in Karnataka?According to CalcGuru, the 2025 amendment to section 15 of the Act levies a surcharge of 1% on the property tax of newly constructed multi-storied buildings, collected by the municipality. It is separate from the NOC fee.
?
What is the Karnataka fire NOC height limit?21 metres. Buildings of 21 metres or above are high rise buildings under the Act, as summarised by CalcGuru and reported by Deccan Herald when the 2023 bill passed. A draft notification of 4 November 2026 proposes 24 metres in the zonal regulations, but it is not in force.
?
Do hospitals below 21 metres need fire approval in Karnataka?Under the January 2026 order reported by Security Today, hospitals below high rise height receive fire advisory certificates based on height and built-up area. A 2024 circular also asked them for a self-declaration of fire measures.
?
Where can I read the official Karnataka fire rules?On the Karnataka State Fire and Emergency Services portal and in the Karnataka Gazette. Summaries in the press are useful, but the official text decides.

Reading is the cheap part.

If any of this described your building, the next step is someone with a torch and a camera walking your risers.