Shaft closing:
the 5-step process
Preparation, mesh, wool, mortar, finish. Skip any one and the seal looks complete while holding nothing.

Five steps, in this order,
every time.
These are photographs from our own shaft closing projects, not illustrations. Tap any one to see it at full size.
What happens if a step is skipped.
Every one of these shortcuts saves half a day and costs the seal its rating. This is what we find when we audit somebody else's work.
The five steps, in one table.
| Stage | What happens | Why |
|---|---|---|
| Step 01 | Preparation & rebaring | We clean out the opening and fix steel bars across it. The bars are what the mortar holds on to. |
| Step 02 | Mesh backing | Fire-rated mesh goes over the bars. It stops the wet mortar from falling through while it sets. |
| Step 03 | Mineral wool packing | High-density mineral wool is packed in tight. It takes the heat and fills the gaps around cables. |
| Step 04 | Fire mortar | Ameetuff fire mortar is applied to the thickness the tested system asks for. Not thinner. |
| Step 05 | Final seal & photos | A top coat closes the surface. Then we photograph it and write down what went in. |
Scroll sideways on a phone.
What a sealed shaft buys you.
Not theory — this is the difference the five steps make on the night it matters.
A cable shaft that is not sealed is a chimney. Smoke and heat reach the floors above in minutes, long before the flames do. People three floors up are in trouble and they never saw a fire.
Seal the shaft at every floor and the fire is boxed in. Everyone above gets the time the stairwell was designed to give them. That is the whole of it, and it is all done before handover.
Questions about the process
Want your shafts checked before you spend anything?
We will look at what is already installed, photograph it, and tell you which floors are actually a problem.