An independent, photographed check of the fire protection hidden in your walls, floors and shafts — with a prioritised gap report in 5 working days.

Finished shaft seal photographed during a passive fire audit
What an audit looks atEvery penetration, shaft and joint — photographed with its location written down.
UL
UL Listed
Armacell fire stop systems
CBRI
CBRI Certified
Ameetuff mortar & coatings
NBC
IV
NBC Part-IV
Documented to the standard
✓
Photographed
Before, during and after
Independent assessment

Most buildings pass the fire inspection.
Then fail the passive one.

A passive fire audit is an independent, photographed check of the fire protection built into your walls, floors and shafts — the part nobody can see once the ceiling is closed. We walk the building, find the gaps, and hand you a list in the order it should be fixed.

The reason this matters is simple. Inspections look at what can be tested — pumps, hydrants, alarms, extinguishers. All of that is visible and all of it gets attention. The passive side sits above ceilings and inside risers, and it is usually the work of a subcontractor who left the site two years ago. A building can have a perfect active fire system and forty open cable holes.

From ₹49,999

Per building · prioritised gap report in 5 working days · the audit fee is adjusted against the remedial work if you appoint us.

Passive fire audit inspection in a Hyderabad building
5 daysFrom the site walk to a photographed, prioritised report.
What we check

Five things, on every floor.

Each one is photographed with its location written down, so the report can be handed to a contractor and acted on without a second site visit.

01
Shaft and penetration sealingEvery cable and pipe opening we can reach, checked against a tested system — not just the ones on the drawing.
02
Intumescent coating integrityStructural steel checked for the right coating, the right thickness and damage from follow-on trades.
03
Joint and linear seal continuityExpansion joints and wall-to-floor junctions, where seals crack quietly and nobody notices.
04
Fire and smoke seal conditionDoor frame seals and penetration seals — present, correct, and not painted over or torn.
05
NBC Part-IV compliance summaryOne plain summary mapped to the standard, so you can hand it to an insurer or an authority as it is.
How it runs

What the week looks like.

No surprises, no open-ended engagement. Four stages, and you know at each one what you have.

StageWhat happensWhat you get
Day 0Short call — building type, floors, drawings if you have them, access constraintsA fixed scope and a date
Day 1–2Site walk. Shafts, risers, ceiling voids, steel, joints, doors. Photographed as we goNothing yet — we do not report from memory
Day 3–4Findings written up, each one located, photographed and ratedDraft gap list
Day 5Report handed over and walked through with your teamPrioritised report + NBC Part-IV summary

Scroll sideways on a phone. Larger buildings take longer — we tell you that at Day 0, not Day 5.

Who asks for one

Three reasons people call.

You do not need all three. One is usually enough to make the audit worth doing before you spend money on remedial work you may not need.

01
A deadline with evidence attachedA hospital accreditation, an insurer review, a handover, or an authority asking to see records. The audit gives you something to hand over.
02
Work was done and nobody kept the recordThe seals may be perfect. Without photographs and locations you cannot prove it, and unproven is treated as undone.
03
You inherited the buildingNew FM team, new owner, or a fit-out that changed everything above the ceiling. Start by finding out what is actually there.
FAQ

What people ask before booking an audit

?
What does a passive fire audit cost?It starts at ₹49,999 for one building and moves with size and floor count. We quote a fixed figure after a short call, not an hourly rate, so the number does not move while we are on site. If you appoint us for the remedial work, the audit fee is adjusted against it.
?
How is this different from a fire NOC inspection?An NOC inspection is a statutory check, largely of the active systems. Our audit is the passive side, in detail, with photographs — the things an NOC visit will not open a ceiling to look at.
?
Will the report just be a list of work you want to sell us?It is a list of what we found, rated by risk, with locations and photographs. Some items will not need us at all — a door seal replaced by your own team, for instance. We say so where that is true.
?
Do you need drawings before the audit?They help and we will ask for them, but we do not need them. Most of the buildings we audit have drawings that stopped matching reality after the second fit-out.
?
Can the audit be done floor by floor?Yes. In hospitals and live offices that is usually the only workable way. We agree the sequence up front and report as each block finishes rather than holding everything to the end.
?
What if the building turns out to be in good shape?Then the report says so, and you have documentation you did not have before. That is a good outcome, not a wasted fee.

Start with a short call, not a site visit.

Tell us the building type and the floor count. We will tell you whether an audit makes sense, and roughly what it would cost, before anyone comes to site.